Skilifts on Espace Killy: What’s up?

For the ski resort of Tignes a new covered travelator to connect easely the Tovière-Rosset area to the Palafour chairlift (2015). A new departure station is under construction for the Rosset skilift (2015). In 2016 and 2018, there is a construction project of two new detachable chairlifts: Les Almes and Le Marais. A new slope, called Twaleg, will be designed on 2016 to improve the return to Tignes Le Lac.

There is also a large construction project for a new gondola from Tignes Brévière to the Marais highland via Les Boisses (2017 to 2020).

 

For the ski resort of Val d'Isère, a new gondola to Solaise is under construction to replace the old gondola and the old chairlift. You will ride uphill with heating seats and wifi. On the top of Solaize, the chair lift of Lac is desmantled to be replaced by three new travelators. Four tubling slopes will be created too. For those works, a part of the woods will be cut down. Therefore, for each tree cut four will be planted and especially on Bellevarde area.